CF1760533755003-tsm20251015074336

WWW.ROBTEX.COM - daydreamsproject.com

Search for IP or hostnames:

daydreamsproject.com checked at 2025-10-15T13:09:14.981Z 39ms 158/158/158 100% R:6

daydreamsproject.com

NSns71.domaincontrol.com
A2603:5:2194::2e🇺🇸 GODADDY-DNS
PTRns71.domaincontrol.com
A97.74.105.46🇺🇸 GODADDY-DNS
PTRns71.domaincontrol.com
NSns72.domaincontrol.com
A2603:5:2294::2e🇺🇸 GODADDY-DNS
PTRns72.domaincontrol.com
A173.201.73.46🇺🇸 GODADDY-DNS
PTRns72.domaincontrol.com
MXmailstore1.secureserver.net
A216.69.141.78🇺🇸 AS398101
PTRosplibsmtp01-v02.prod.phx3.secureserver.net
A216.69.141.114🇺🇸 AS398101
PTRosplibsmtp03-v02.prod.phx3.secureserver.net
A216.69.141.162🇺🇸 AS398101
PTRosplibsmtp02-v02.prod.phx3.secureserver.net
MXsmtp.secureserver.net
A216.69.141.71🇺🇸 AS398101
PTRosplibsmtp01-v01.prod.phx3.secureserver.net
A216.69.141.84🇺🇸 AS398101
PTRosplibsmtp02-v01.prod.phx3.secureserver.net
A216.69.141.113🇺🇸 AS398101
PTRosplibsmtp03-v01.prod.phx3.secureserver.net
A3.33.130.190🇺🇸 Amazon
PTRa2aa9ff50de748dbe.awsglobalaccelerator.com
A15.197.148.33🇺🇸 Amazon
PTRa2aa9ff50de748dbe.awsglobalaccelerator.com

com

NSa.gtld-servers.net
NSb.gtld-servers.net
NSc.gtld-servers.net
NSd.gtld-servers.net
NSe.gtld-servers.net
NSf.gtld-servers.net
NSg.gtld-servers.net
NSh.gtld-servers.net
NSi.gtld-servers.net
NSj.gtld-servers.net
NSk.gtld-servers.net
NSl.gtld-servers.net
NSm.gtld-servers.net

Starts with same word

Starts similarily

AI analysis

daydreamsproject.com points to two IPs: 3.33.130.190 and 15.197.148.33.

Other host names including sajeel.org, reliancespa.in, amcored.com, tsihcorp.com and torontosmarthome.ca share IP numbers with daydreamsproject.com.

daydreamsproject.com's delegation uses two name servers, ns71.domaincontrol.com and ns72.domaincontrol.com.

daydreamsproject.com shares the same name server setup as other domains, for example cpap.expert, top3ds.com, magic-mushroom-growkits.net, itzinger.com and fajl.me.

Host names with two IPs:

ns71.domaincontrol.com points to: 2603:5:2194::2e and 97.74.105.46

ns72.domaincontrol.com points to: 2603:5:2294::2e and 173.201.73.46

daydreamsproject.com is handled by two mail servers: mailstore1.secureserver.net and smtp.secureserver.net.

daydreamsproject.com shares its mail server setup with other domains, including edmontondemo.com, ranchoperformancecenters.net, locertified.com, vacanzepersingle.com and img.pictures.

daydreamsproject.com shares some mail servers with other domains, at least partially, for instance idolcult.com.

Host names with three IPs:

mailstore1.secureserver.net points to 216.69.141.78, 216.69.141.114 and 216.69.141.162

smtp.secureserver.net points to 216.69.141.71, 216.69.141.84 and 216.69.141.113

Perform reverse DNS lookup as well as normal forward DNS. Check Autonomous System Numbers (ASNs) and BGP connections between Internet Service Providers.
dbq

OcRSdSh CF johedugfp 2025-10-15